Page 120 - Damen Shipyards Group
P. 120

120  REPAIR & CONVERSION | KAREL DOORMAN                                                                                                                                                                                                           121



               n 5  of March, the Royal Netherlands Navy (RNLN) Joint Support Ship (JSS) Zr.Ms. Karel
                  th
               Doorman entered dry dock no.4 at Damen Shiprepair Amsterdam (DSAm) to begin her                                         the Netherland’s Directie Materiële Instandhouding (DMI) which   As well as its excellent planning skills, DSAm also has the advantage
     Ofirst five-year maintenance programme. This was to be no ordinary maintenance and repair                                         has overall responsibility for the project, has issued 320, covering   of experience gained in 2018 from a lifetime extension programme
                                                                                                                                       almost every system and space on board what is, after all, an
                                                                                                                                                                                                   undertaken on the RNLN’s 20-year old, 166-metre, amphibious
      programme, but then again, the Karel Doorman is no ordinary ship. The 205-metre vessel is the                                    exceptionally complex vessel.                               warfare ship HNLMS Rotterdam, also built by DSNS. As a dress-
      largest and most complex vessel in the RNLN, and she was built by Damen, largely at Damen                                                                                                    rehearsal for the much larger Zr.Ms. Karel Doorman it provided
      Shipyards Galati, Romania, under the supervision of Damen Schelde Naval Shipbuilding in Vlissingen.                              The orders cover everything from the cleaning of all the tanks   valuable experience and insights into the equipment and issues
                                                                                                                                       and servicing all the valves to painting the exterior hull and
                                                                                                                                                                                                   that the DSAm team would be facing in the coming year.
      In August 2013 she was transferred to Vlissingen for the completion of her outfitting, commissioning                             topsides and removing all the electrical equipment for serving
      and sea trials before being handed over to the navy in September 2014.                                                           and replacement where necessary. The elevators and the lifeboat   A win-win for all
                                                                                                                                       cranes are also undergoing maintenance and the rudders have   Projects of this size and complexity bring many benefits. Building
                                                                                                                                       been removed and their bearings and aft seals inspected. And   and maintaining advanced naval vessels within the Damen family
      FIVE YEARS ON DAMEN SHIPREPAIR                                                                                                   that’s just the beginning. However, one major area will not be   not only benefits the company, it creates and nurtures a pool of
                                                                                                                                                                                                   experience and expertise that ensures that the Netherlands retains
                                                                                                                                       subject to works by the DSAm team and their subcontractors, and
                                                                                                                                       that is her military systems and anything else of a sensitive nature.
      AMSTERDAM PERFORMS KAREL                                                                                                         These were all removed at the RNLN base at Den Helder for their   the capability to build its own next-generation vessels and keep
                                                                                                                                                                                                   them in top condition, now and in the future, in its own yards. It
                                                                                                                                                                                                   also ensures that the wider Dutch naval sector remains innovative,
                                                                                                                                       own, separate, maintenance programme before the vessel came to
      DOORMAN REFIT                                                                                                                    Amsterdam.                                                  efficient and diverse, as evidenced by the many companies involved
                                                                                                                                                                                                   with the Zr.Ms. Karel Doorman, which boosts exports.
                                                                                                                                       Taking planning to a new level
                                                                                                                                       With so many components and systems requiring specialist   The Zr.Ms. Karel Doorman is scheduled to leave Damen Shiprepair
                                                                                                                                       attention it is not surprising that there are 119 different companies   Amsterdam in July this year, having spent five months in the dry
      A complex vessel for a multi-purpose role                  exceptionally durable vessel under even the most adverse              and organisations involved in the works, as well as the ship’s very   dock having every inch of her inspected and checked. From there
      She was designed and built to take on a wide-ranging role   conditions. Defensive systems include two Goalkeeper anti-missile    helpful officers and crew. With so many stakeholders on board,   she will return to Den Helder where she will undergo another six
      including maritime support, replenishment at sea, supply storage,   units, two 30 millimetre machine guns and a CHAFF decoy system,   often overlapping in the areas that they need to access, the use of   months of work, including replacing the ‘special systems’ that were
      loading and unloading of supplies, transport of equipment and   plus short-range machine guns. Propulsion is diesel-electric with   integrated master planning to model every activity taking place is   removed at the start, before starting
      personnel, and technical and logistical support. 2,000 lane metres   five main generators and a DP-1 dynamic positioning system. In   vital to ensure that everyone is in the right place at the right time,   another, no doubt busy, five years.
      of cargo capacity allows her to carry an exceptional quantity of   keeping with the Damen philosophy of building navy ships, she   working smoothly and efficiently alongside each other. One team,
      stores, while a helicopter deck designed to operate two Chinooks   incorporated as many commercial techniques and components as   one task, is the underlying philosophy that keeps everyone focused
      simultaneously allows her to deliver supplies over distances of   possible, adding military-grade equipment only where it was really   on what they need to do. DSNS, with all its accumulated knowledge
      500 kilometres or more. Other delivery systems include two   needed.                                                             from the original build, is also playing a vital role
      replenishment-at-sea masts for fuel transfer, a stern beach for                                                                  in the project at every level.
      cargo transfer via landing craft that can be sunk to a metre below   Five years on and after many thousands of nautical miles on various
      the waterline, and RoRo capability.                        missions including delivering humanitarian support to ebola victims
                                                                 in Sierra Leone and undertaking hurricane relief operations in
      The vessel features the latest in command and control systems,   the Caribbean following the passage of Hurricane Irma in 2017,
                          and a high level of automation, multiple   she is now in DSAm for a repair and maintenance programme of
                                redundancy and internal armouring   exceptional thoroughness and detail.
                                  for critical areas make her an
                                                                 No stone left unturned
                                                                 A five year maintenance programme for a commercial vessel usually
                                                                 involves around 50 separate projects, each detailed in an individual
                                                                 technical specification order. For the Zr.Ms. Karel Doorman,
   115   116   117   118   119   120   121   122   123   124